Bulgaria:
Sofia I, Plovdiv, Russe, Sofia II, Varna,
St.Zagora and Bourgas.
Part of structure for Rusia: Moskow
I, II and presstres concrete for
Croatia-Zagreb
Modeling and analysis of the construction
under the influence of vertical loads, temperature
and dynamic analysis (earthquake, autos).
The construction of the
building has been chosen in accordance with
the requirements of the investor. The precast
concrete construction is both cheep and
very fast to assemble. So the main construction
of the roof of thebuilding
is from purlins on 14 m span, wich are lying
on system from prestressed beams with 21m
span, 10.50m precast beams from plane concrete.
The columns are also from precast concrete.
There is a middle plate from panels with
holes, witch are assembled with cased in
situ conctete. Part of the parking is roofed
with canope - steel frame construction.
|